<space=1em><b>Progressive traction</b>

<space=1em>In the mid-1950s, a large-scale process of replacing steam locomotives with "progressive types of traction" — diesel and electric — began on the USSR railway transport. For train operation on sections and entire lines of railways that were being converted to diesel traction, a large number of new powerful diesel locomotives were required that could successfully replace steam locomotives. The TE1 and TE2 series machines created in the USSR in the second half of the 1940s no longer met such requirements — more powerful locomotives were needed.

<space=1em><b>Development of the project</b>

<space=1em>In <nobr>1952–1953</nobr> the Kharkov Plant of Transport Engineering (KhZTM) created a new model of a mainline diesel locomotive, designated the TE3 series. This is a two-section locomotive consisting of two identical six-axle sections. Each section is equipped with a ten-cylinder, two-stroke diesel 2D100 with a capacity of <nobr>2,000 hp</nobr> of a very unique design (with two crankshafts and counter-moving pistons), the prototype of which was the diesel engine of the American company Fairbanks-Morse, installed on ships.

<space=1em>The power transmission on the locomotive is electric, direct current. The traction generator <nobr>МПТ-99/47</nobr> had a continuous power of <nobr>1,350 kW</nobr>. The traction motors <nobr>ЭДТ-200</nobr> with a continuous power of <nobr>200 kW</nobr> had a support-axial suspension. Automatic control of the power transmission was carried out by a special electric machine system for regulating the excitation of the traction generator. All the main electrical equipment was designed and manufactured at the Electrotyazhmash plant in Kharkov.

<space=1em><b>Into series</b>

<space=1em>The first sample of the TE3 diesel locomotive was manufactured at KhZTM in early <nobr>1954</nobr> Due to the positive results of the tests of this locomotive, even before their official completion, the new machine was launched into serial production in <nobr>1955</nobr>. Moreover, starting from the following year, the production of TE3 series diesel locomotives was organized simultaneously at three plants. In addition to KhZTM (locomotives with <nobr>№ 001</nobr> and higher were produced here), similar locomotives began to be produced at Kolomensky (with <nobr>№ 1001</nobr> and higher) and Lugansk (Voroshilovgrad, with <nobr>№ 2001</nobr> and higher) plants.

<space=1em>During serial production, numerous changes and improvements were made to the design of the locomotive. Since <nobr>1957</nobr> a new design of the control cabin was used (as on TE7 diesel locomotives). Since <nobr>1959</nobr> buffers were no longer installed on the front part of the body. Since <nobr>1962</nobr> new design bogies have been used <nobr>etc.</nobr>

<space=1em><b>Mass production</b>

<space=1em>TE3 series diesel locomotives were produced for <nobr>20 years</nobr>, with the total number of vehicles produced at the Kharkov <nobr>plant —</nobr> <nobr>598 units</nobr> (<nobr>No. 001–598</nobr> in <nobr>1954–1962</nobr>), at the Kolomna <nobr>plant —</nobr> <nobr>406 units</nobr> (<nobr>No. 1001–1406</nobr> in <nobr>1956–1963</nobr>), at the Lugansk (Voroshilovgrad) <nobr>plant —</nobr> <nobr>5,805 units</nobr> (<nobr>№ 2001–7805</nobr> in <nobr>1956–1973</nobr>).

<space=1em>As can be seen, since <nobr>1963</nobr> diesel locomotives of the <nobr>TE3 series</nobr> were produced only at the Lugansk plant. The total number of machines built over two decades by three plants is <nobr>6,809 units</nobr>. Also serially produced were diesel locomotives of the <nobr>3TE3</nobr> series (three-section version) and TE7 (version for passenger traffic), created on the basis of the TE3.

<space=1em>As a result, the TE3 series locomotives became the most widespread mainline diesel locomotives on the roads of the USSR. They were used on almost all railways of the <nobr>MPS network —</nobr> from Brest to the Far East and from Arkhangelsk to Transcaucasia and Central Asia. The gradual exclusion of TE3 diesel locomotives from the inventory began in the <nobr>1980s</nobr> and was completed in the <nobr>1990s.</nobr>

<space=1em>On the October Railway, TE3 diesel locomotives in the <nobr>1970s–1980s</nobr> were the main series of diesel locomotives serving freight traffic on the road. The last machines of this series were written off here in the early <nobr>1990s.</nobr>

<space=1em><b>Museum exhibit</b>

<space=1em>The <nobr>TE3 1001</nobr> diesel locomotive presented in the museum, manufactured in <nobr>1956 </nobr>, is the first locomotive of this series built at the Kolomna plant (and the first diesel locomotive manufactured by this plant in the post-war period). After construction, it was sent to the Moscow-Kursk-Donbass Railway, in <nobr>1957</nobr> it was transferred to the South-Eastern, in <nobr>1958 —</nobr> to the Volga, in <nobr>1960 —</nobr> to the North Caucasian.

<space=1em>The diesel locomotive arrived at the museum from the Krasnodar depot of the North Caucasian Railway in <nobr>1996</nobr>

ID экспоната:  53

Аудио:  http://dpmzdr.infomedia.digital/files/33/55/3355d74c8fc4f13cfba8bb47579483be3ca584ea.ogg

Галерея изображений:  http://dpmzdr.infomedia.digital/files/a1/5f/s1a15fe8fb905899e0eb69919af87cefc146a4d93e.jpg / http://dpmzdr.infomedia.digital/files/7f/d6/s17fd6c52b3305aaaca3ac2ddf4ba79bedf7d5ae8f.jpg / http://dpmzdr.infomedia.digital/files/1b/71/s11b717663cce4e2d275c7ea3d2846ac11280c38ab.jpg

Галерея изображений (оригинал):  http://dpmzdr.infomedia.digital/files/a1/5f/a15fe8fb905899e0eb69919af87cefc146a4d93e.jpg / http://dpmzdr.infomedia.digital/files/7f/d6/7fd6c52b3305aaaca3ac2ddf4ba79bedf7d5ae8f.jpg / http://dpmzdr.infomedia.digital/files/1b/71/1b717663cce4e2d275c7ea3d2846ac11280c38ab.jpg

Галерея изображений 2000:  http://dpmzdr.infomedia.digital/files/a1/5f/s2a15fe8fb905899e0eb69919af87cefc146a4d93e.jpg / http://dpmzdr.infomedia.digital/files/7f/d6/s27fd6c52b3305aaaca3ac2ddf4ba79bedf7d5ae8f.jpg / http://dpmzdr.infomedia.digital/files/1b/71/s21b717663cce4e2d275c7ea3d2846ac11280c38ab.jpg

Исторические фото:  http://dpmzdr.infomedia.digital/files/1b/c2/s11bc2d90f962f6c8430ac6352670d39f48facbf99.jpg / http://dpmzdr.infomedia.digital/files/88/1c/s1881c5122257e0e47719f87957fa8ef3d42ed70ed.jpg / http://dpmzdr.infomedia.digital/files/01/fa/s101fa6a5d0ff4121ae7778f5b9042c08aad06545c.jpg / http://dpmzdr.infomedia.digital/files/f9/7a/s1f97a0095b03b9aef6702ecc2bc2685a0251c7db3.jpg / http://dpmzdr.infomedia.digital/files/1c/fb/s11cfb48518ef816204ad785d603f2c993a14e9b2e.jpg / http://dpmzdr.infomedia.digital/files/8d/98/s18d981bd62d5e3b4bd80f77c5e9ac904058925ff4.jpg / http://dpmzdr.infomedia.digital/files/b6/48/s1b648477ef5962e7e164661c4131e0b962d8b6151.jpg / http://dpmzdr.infomedia.digital/files/49/3e/s1493edf97f9fb0187bde44d813884e0bc3a4dcc75.jpg / http://dpmzdr.infomedia.digital/files/06/83/s10683d681d277fc6a227c26bda019eb81744bb6e1.jpg / http://dpmzdr.infomedia.digital/files/2d/6e/s12d6e6755708215904f296e44e68e8f053f1019c8.jpg / http://dpmzdr.infomedia.digital/files/9b/e2/s19be2c34e9c8cea8d927a64239ebec58726f7b6f6.jpg / http://dpmzdr.infomedia.digital/files/62/c2/s162c2a07c00dd64f1da911e4c511937cc08a1d612.jpg / http://dpmzdr.infomedia.digital/files/96/de/s196de7fd3b39aa24b14480a4fe9f9f76e5ef3b0a8.jpg / http://dpmzdr.infomedia.digital/files/c2/80/s1c2804d297569afec83e6357b5a6beb11a8923df9.jpg / http://dpmzdr.infomedia.digital/files/bf/92/s1bf92e1a1d545b44b904524c89e733e78da423c8d.jpg / http://dpmzdr.infomedia.digital/files/2c/37/s12c371940c67262a9cb0a5c5f19a90ab6c3abc986.jpg / http://dpmzdr.infomedia.digital/files/e5/fb/s1e5fb24e95da0c8f5907422b28e34c4983dbba9fa.jpg / http://dpmzdr.infomedia.digital/files/01/2a/s1012ae05f4f4fd5d41080206d9b12da5ab70d1b3a.jpg / http://dpmzdr.infomedia.digital/files/4e/dc/s14edcf32f5abf7e2f22d1c08ef941ac28c3e2e150.jpg / http://dpmzdr.infomedia.digital/files/a4/73/s1a47324b7b2955f6e90673acc72414a4f96704c35.jpg / http://dpmzdr.infomedia.digital/files/bf/cf/s1bfcf574ed84c4ba715c4a6e5277ba176a046f8f4.jpg / http://dpmzdr.infomedia.digital/files/07/8b/s1078ba7afa13c01111f080c1dfd21f19f749571b6.jpg

Параметры (технические характеристики):  Number of locomotive section 2 Axial formula 2 (3<sub>0</sub> – 3<sub>0</sub>) / Length, mm 33 948  Total wheelbase, mm 29 774  Service weight of the two sections,  t 252 Moving axis load on rails,  t 21 Fuel stock,  kg 2×5440 Moving wheel diameter, mm 1 050  Design speed, km/h 100  MAIN DIESEL Product type 2D100 Number of strokes 2 Rated power,  hp 2 000 Rated rpm 850 CYLINDERS Location In-line Quantity 2×10 (each cylinder with two pistons moving in opposite directions) Diameter, mm 207  Piston stroke, mm 2×254  Operating, rpm 1 700 MAIN GENERATOR Type MPT99/47 Rated power, kW 1 350  Maximum voltage, V 820  Continuous current, A 2 455  Short time current, A 4 000  ELECTRIC TRACTION MOTOR Type EDT200b Quantity 2х6 Rated power, kW 206  Current, A 800  Maximum voltage, V 410  Max rpm 2 200

План:  http://dpmzdr.infomedia.digital/files/03/47/03476cc940ecca7d3367a3c639f1a3ea781d8027.jpg / http://dpmzdr.infomedia.digital/files/83/f6/83f6588c3362196e2f895ad3c29d0b32bd5e466a.jpg / http://dpmzdr.infomedia.digital/files/f4/db/f4dbc2b23f2fd631541222473df297b3fba37e98.jpg

План 1000:  http://dpmzdr.infomedia.digital/files/03/47/s103476cc940ecca7d3367a3c639f1a3ea781d8027.jpg / http://dpmzdr.infomedia.digital/files/83/f6/s183f6588c3362196e2f895ad3c29d0b32bd5e466a.jpg / http://dpmzdr.infomedia.digital/files/f4/db/s1f4dbc2b23f2fd631541222473df297b3fba37e98.jpg

План 2000:  http://dpmzdr.infomedia.digital/files/03/47/s203476cc940ecca7d3367a3c639f1a3ea781d8027.jpg / http://dpmzdr.infomedia.digital/files/83/f6/s283f6588c3362196e2f895ad3c29d0b32bd5e466a.jpg / http://dpmzdr.infomedia.digital/files/f4/db/s2f4dbc2b23f2fd631541222473df297b3fba37e98.jpg

Хронология:  <space=1em>In the mid-1950s, a large-scale process of replacing steam locomotives with progressive types of traction - diesel and electric - began on the USSR railway transport. Sections and entire lines of railways were converted to diesel traction. For train work on them, a large number of new powerful diesel locomotives were required that could successfully replace steam locomotives. Diesel locomotives TE1 and TE2, which were produced from the late 40s to the mid-50s, were no longer suitable for this task. Although they had a good diesel engine D49, its power was not enough for train work. <space=1em>Back in 1940-1941, the Kolomensky Plant was conducting design work on a diesel locomotive of the T16 project - a single-section diesel locomotive on two three-axle bogies with electric transmission and an engine with a capacity of 2,000 hp. A new technical assignment for the design of a two-section diesel locomotive with an engine of the same power and a design speed of 90-100 km/h was issued in 1947. <space=1em>Design work began in 1950 at the Kharkov Plant of Transport Engineering and the Kharkov Plant of Diesel Locomotive Electrical Equipment. At the end of 1953, the construction of the experimental section of the TE3-001 diesel locomotive was completed, and at the beginning of 1954, the second section TE3-002 was released. In the TE series, it means "Diesel Locomotive with Electric Transmission", and 3 is the third type. <space=1em>In 1955, the Kharkov Plant manufactured diesel locomotives No. 002-011. Now each locomotive was assigned one number, and the sections were designated by the letters "A" and "B". The first two sections, TZ3-001 and TE3-002, were combined into one locomotive, numbered 001. <space=1em>Extensive testing took place in 1955 and 1956, and the necessary changes were made immediately to the 1955 pilot batch. <space=1em>In connection with this, serial production of TE3 series freight diesel locomotives was organized in a short time, which were built in large quantities at three plants from 1956 to 1973. <space=1em>The design of the locomotive apparently changed in 1957 — large windows appeared in the shape of the cabin for a better view of the track and visibility for the driver when coupling the locomotive to the car. <space=1em>Since mid-1959, buffers were no longer installed on diesel locomotives. <space=1em>The TE3 series freight diesel locomotives were produced at the Kharkov plant in 1955–1962 (No. 001–598), the Kolomensky plant in 1956–1963 (No. 1001–1406), and the Voroshilovgrad (Lugansk) plant in 1956–1973 (No. 2000–7805). In total, the three plants built 9,809 locomotives of this series. <space=1em>The appearance of non-electrified railways in the USSR was determined by diesel locomotives of this series for almost 30 years. <space=1em>The TE3-1001 diesel locomotive is the first TE-3 series locomotive, produced at the Kolomensky Diesel Locomotive Plant. Factory numbers of sections 0051 and 0052, it was sent to work at the Uzlovaya depot of the Moscow-Kursk-Donetsk Railway. <space=1em>In 1957, the locomotive was transferred to the South-Eastern Railway, in 1958 - to the Volga Railway, in 1960 - to the North Caucasian Railway. It was transferred to the museum from the Krasnodar depot of the North Caucasian Railway in 1996. <space=1em>Diesel locomotives TE3-1002 and 1010 worked out their days at the Likhobory depot of the Moscow Railway (Moscow Ring) until the mid-1980s.

Блоки описания:  [{"quote":"The TE1- and TE2-class diesel locomotives produced in the USSR in the second half of the 1940s no longer met these requirements — more powerful locomotives were needed.","title":"","images":[],"content":"The mid-1950s marked a major initiative in the USSR’s railway network to replace steam locomotives with “progressive types of traction” — diesel and electric. For train operations on sections and entire railway lines being converted to diesel traction, a large number of new, powerful diesel locomotives were needed to replace steam locomotives. The TE1- and TE2-class vehicles produced in the USSR in the second half of the 1940s no longer met these requirements — more powerful locomotives were needed.","subtitle":"Progressive Traction"},{"quote":"The TE3 was equipped with a ten-cylinder two-stroke diesel engine with two crankshafts and opposed pistons, based on an American engine for watercraft.","title":"New Class","images":[],"content":"In 1952–1953, a new model of mainline diesel locomotive was designed at the Kharkiv Locomotive Works and were given the class designation TE3. This was a two-unit locomotive consisting of two identical six-axle units. Each unit was equipped with a ten-cylinder 2D100 two-stroke 2,000 hp diesel engine of a highly original design (with two crankshafts and opposed pistons), based on a diesel engine by American company Fairbanks-Morse thatwas installed on watercraft.","subtitle":"Project Development"},{"quote":"","title":"","images":[],"content":"The diesel locomotive’s power transmission was electric (direct current). The MPT-99\/47 traction generator had continuous power of 1,350 kW. The EDT-200 200 kW continuous-power traction engines each had support-axle suspension. The power transmission was automatically controlled by a special electromagnet system for regulating the traction generator excitation. All the main electrical equipment was designed and manufactured at the Electrotyazhmash Plant in Kharkiv.","subtitle":""},{"quote":"","title":"","images":[],"content":"The first TE3-model diesel locomotive was built at KhPZ in early 1954. The positive results seen from this locomotive, even before testing was officially finished, meant that it was put into series production in 1955. From the following year, the class TE3 diesel locomotive was put into production at three plants simultaneously. As well as at KhPZ (where diesel locomotives no. 001 and above were built), the same locomotive was built at the Kolomna Locomotive Works (no. 1001 and above) and the Luhansk (Voroshilovgrad, no. 2001 and above) Locomotive Works.","subtitle":"Series Production"},{"quote":"","title":"","images":[],"content":"Numerous changes and improvements were made to the locomotive’s design throughout series production. From 1957, there was a new control cab design (the same as the TE7 diesel locomotive); from 1959, buffer gears were no longer installed on the front of the body and from 1962, there was a new truck design, etc.","subtitle":""},{"quote":"","title":"Mass Production","images":[],"content":"Class TE3 diesel locomotives were produced for 20 years, and the total number produced at each plant was: the Kharkiv Locomotive Works (the Malyshev Factory) — 598 units (no. 001–598 from 1954 to 1962); the Kolomna Locomotive Works — 406 units (no. 1001–1406 from 1956 to 1963); the Luhansk (Voroshilovgrad) Locomotive Works — 5805 units (no. 2001–7805 from 1956 to 1973).","subtitle":"6,809 Locomotives"},{"quote":"The three plants built 6,809 locomotives over 20 years, making it the most commonly produced mainline diesel locomotive in the USSR.","title":"","images":[],"content":"As indicated above, from 1963, class TE3 diesel locomotives were produced at the Luhansk Locomotive Works only. The total number of vehicles built over two decades at three plants came to 6,809. Variants based on the TE3 were also series produced: the class 3TE3 diesel locomotive (three-unit variant) and the class TE7 (passenger transport variant).","subtitle":""},{"quote":"","title":"","images":[],"content":"As a result, class TE3 locomotive became the most common mainline diesel locomotive on Soviet railways. They were in operation on practically every rail network of the Ministry of Railways — from Brest to the Far East and from Arkhangelsk to the South Caucasus and Central Asia. TE3 diesel locomotives were gradually removed from the inventory beginning in the 1980s and ending in the 1990s.","subtitle":""},{"quote":"","title":"","images":[],"content":"In the 1970s-80s, TE3 diesel locomotives were the main class of diesel locomotive driving freight traffic on the Oktyabrskaya Railway. The last vehicles of this class were decommissioned here in the early 1990s.","subtitle":""},{"quote":"","title":"","images":[],"content":"The TE3 1001 diesel locomotive displayed in the museum was built in 1956 and was the first locomotive of this class built at the Kolomna Locomotive Works (and the first diesel locomotive built by this plant after the war). After construction, it was delivered to the Moscow-Kursk-Donbas Railway. In 1957, it was transferred to the South-Eastern Railway, then in 1958, to the Privolzhskaya Railway, and in 1960, to the North Caucasus Railway.","subtitle":"Museum Exhibit"}]

Характеристики (блоками):  [{"name":"General data","type":"text","value":"","is_two_colls":false},{"name":"Year of issue","type":"number","value":"1956","is_two_colls":false},{"name":"Number of locomotive sections","type":"number","value":"2","is_two_colls":false},{"name":"Axial formula","type":"number","value":"2 (3о-3о)","is_two_colls":false},{"name":"Length, mm","type":"number","value":"33,948","is_two_colls":false},{"name":"Full wheelbase, mm","type":"number","value":"29,774","is_two_colls":false},{"name":"Service weight of two sections, t","type":"number","value":"252","is_two_colls":false},{"name":"Load from moving axle on rails, t","type":"number","value":"21","is_two_colls":false},{"name":"Fuel reserve, kg","type":"number","value":"2 x 5 440","is_two_colls":false},{"name":"Diameter of moving wheels, mm","type":"number","value":"1,050","is_two_colls":false},{"name":"Design speed, km\/h","type":"number","value":"100","is_two_colls":false},{"name":"Main diesel","type":"text","value":"","is_two_colls":false},{"name":"Diesel type","type":"number","value":"2D100","is_two_colls":false},{"name":"Number of cycles","type":"number","value":"2","is_two_colls":false},{"name":"Nominal power, hp","type":"number","value":"2,000","is_two_colls":false},{"name":"Nominal speed per minute","type":"number","value":"850","is_two_colls":false},{"name":"Cylinders","type":"text","value":"","is_two_colls":false},{"name":"Location","type":"text","value":"In-line","is_two_colls":false},{"name":"Working speed per minute","type":"number","value":"1700","is_two_colls":false},{"name":"Diameter, mm","type":"number","value":"207","is_two_colls":false},{"name":"Piston stroke, mm","type":"number","value":"2 x 254","is_two_colls":false},{"name":"Quantity of cylinders","type":"number","value":"10","is_two_colls":false},{"name":"Quantity of pistons in cylinders","type":"number","value":"2","is_two_colls":false},{"name":"Main generator","type":"text","value":"","is_two_colls":false},{"name":"Type","type":"text","value":"MPT99\/47","is_two_colls":false},{"name":"Nominal power, kW","type":"number","value":"1,350","is_two_colls":false},{"name":"Maximum voltage, V","type":"number","value":"820","is_two_colls":false},{"name":"Current is long lasting, A","type":"number","value":"2 455","is_two_colls":false},{"name":"Short-term current, A","type":"number","value":"4,000","is_two_colls":false},{"name":"Traction electric motor","type":"text","value":"","is_two_colls":false},{"name":"Type","type":"number","value":"EDT200b","is_two_colls":false},{"name":"Quantity","type":"number","value":"2 х 6","is_two_colls":false},{"name":"Nominal power, kW","type":"number","value":"206","is_two_colls":false},{"name":"Current, A","type":"number","value":"800","is_two_colls":false},{"name":"Maximum voltage","type":"number","value":"410 В","is_two_colls":false},{"name":"Maximum rpm","type":"number","value":"2 200","is_two_colls":false}]

История (блоками):  [{"year":"Early 1950s","content":"The Kharkiv Locomotive Works and the Kharkiv Diesel Locomotive Electrical Equipment Plant start designing a new model mainline diesel locomotive — the class TE3."},{"year":"1952–1953","content":"The new model of mainline diesel locomotive is built at the Kharkiv Locomotive Works and given the class designation TE3."},{"year":"1955","content":"TE3 locomotives are put into series production at the Kharkiv Locomotive Works."},{"year":"1956","content":"The Kolomna Locomotive Works and the Luhansk (Voroshilovgrad) Locomotive Works begin production of the class TE3. TE3 1001 is the first diesel locomotive produced at the Kolomna Locomotive Works after the war."},{"year":"1957","content":"The new control cab design (the same as the TE7 diesel locomotive) is launched."},{"year":"1959","content":"Buffer gears are no longer installed on the front of the body of the TE3."},{"year":"1962","content":"The TE3 receives a new truck design. The Kharkiv Locomotive Works, renamed into the Malyshev Factory by that time, concludes production of class TE3 diesel locomotives. In total, 598 locomotives were built, no. 001–598."},{"year":"1963","content":"Production at the Kolomna Locomotive Works concludes. In total, 406 locomotives were built, no. 1001–1406."},{"year":"1973","content":"The Luhansk (Voroshilovgrad) Locomotive Works builds the last class TE3 diesel locomotive. In total, 5,805 locomotives were built, no. 2001–7805."},{"year":"1980-е","content":"Decommissioning of class TE3 diesel locomotives begins."},{"year":"1990-е","content":"Decommissioning of class TE3 diesel locomotives is completed."},{"year":"1996","content":"Diesel locomotive TE3 1001 arrives at the museum from the Krasnodar Depot of the North Caucasus Railway."}]

Чертежи (блоками):  [{"src":"http:\/\/dpmzdr.infomedia.digital\/files\/03\/47\/s203476cc940ecca7d3367a3c639f1a3ea781d8027.jpg","title":"Longitudinal section"},{"src":"http:\/\/dpmzdr.infomedia.digital\/files\/83\/f6\/s283f6588c3362196e2f895ad3c29d0b32bd5e466a.jpg","title":"General appearance"},{"src":"http:\/\/dpmzdr.infomedia.digital\/files\/f4\/db\/s2f4dbc2b23f2fd631541222473df297b3fba37e98.jpg","title":"General appearance"}]

Модель (деталка):  TE3 1001

Заголовок (деталка):  Freight two-section diesel locomotive

Подвал описания:  The diesel locomotive came to the museum in 1996 from the Krasnodar Depot of the North Caucasus Railway.

Заголовок истории:  Chronology

Mnemonic code:  53

Code in external DB source:  396

Name:  TE3-1001